Lumber, roof trusses, joists, panels and structural steel travel by flatbed trucking. The open trailer loads from the sides with a forklift or from the top with a crane, at pickup as well as on the job site.
Your materials reach the job site when the crew is ready to install them.
For more than 25 years, Trans-Inter Logistik has organized the delivery of your construction materials and job site equipment across Quebec, Canada and into the United States, through its network of vetted carriers and with a free quote for every delivery.
Our construction freight services
As a freight broker, we handle logistics for the construction industry: pickup at the supplier, the lumberyard or the plant, then delivery to the job site. Trucks, trailers and drivers come from the carriers in our network; we set the equipment, the delivery window and the tracking.
The right flatbed, at the right time, in front of the right job site.
Job site delivery with a truck-mounted forklift
With no dock or forklift on site, we look in our network for a flatbed fitted with a Moffett-type truck-mounted forklift: the driver then sets your pallets on the ground, at the spot agreed with your foreman.
Curtainside trailers and tarping
Construction materials that must stay dry, such as insulated panels, finishing lumber and roofing shingles, ship under tarps or in a curtainside trailer. This trailer keeps the side access of a flatbed while protecting the load from the weather.
Heavy equipment and oversize loads
Excavators, loaders and aerial lifts usually travel on a lowboy trailer, pulled by a tractor whose number of axles matches the weight to carry, if the network offers one. If the machinery is oversized, the file becomes an oversize load transport job: Quebec’s Ministère des Transports et de la Mobilité durable (in French) then issues a special travel permit to the carrier.
Construction materials we ship
Residential, commercial, institutional, civil engineering or infrastructure: every job site receives its materials, often bulky, long or heavy, on the equipment that suits them.
- Lumber, planks, beams, roof trusses and floor joists.
- OSB panels, plywood and insulated panels.
- Structural steel, columns, pipes and conduits.
- Pavers, stone, concrete blocks and bags of cement or mortar on pallets.
- Shingles, roofing materials and prefabricated components.
- Job site machinery, tools and pallets of hardware.
For large volumes, a B-train (two linked flatbeds) offers more payload than the legal weight of a 53-foot trailer allows. Over long distances, intermodal transportation is worth comparing.
Job site delivery in 5 steps
For a single flatbed of lumber or for material deliveries throughout the project, here is how we work:
- You share the details. Materials, dimensions and weight, job site address, site access, permitted delivery hours and unloading equipment on site.
- We choose the trailer. Flatbed, lowboy, curtainside, B-train or truck-mounted forklift, depending on the network, as a full truckload (FTL) or as less-than-truckload (LTL).
- We select the carrier. Its safety rating, insurance and equipment must meet our criteria.
- We set the pickup. Loading time at the distributor, securement and tarping specified to the carrier, delivery window confirmed with the job site.
- We track until unloading. In-transit tracking, a call before arrival to keep your schedule, handling arranged in advance and proof of delivery signed on site.
Materials to deliver to a job site?
Tell us what, from where and to which job site address: we come back with the right trailer and a delivery window.
Shipping materials during the spring thaw
In spring, Quebec’s Ministère des Transports et de la Mobilité durable imposes load restrictions on heavy vehicles during the thaw period (in French). The restrictions cover three zones, and their dates can be moved earlier, suspended or delayed depending on the weather.
A trailer of pavers, concrete or steel must then leave with a lighter load, sometimes in two trips. We adjust the shipping plan for your job sites: material deliveries moved ahead of the period, reduced loads and close follow-up of each zone’s dates.
Job site delivery in urban areas
An urban job site comes with its own constraints: a narrow street, limited unloading space, a delivery window set by the municipality or the general contractor. We then choose a truck and trailer that can reach the site while complying with local regulations.
Construction materials freight pricing
The price of a materials delivery comes down to these factors, itemized in the quote:
- the trailer type (flatbed, lowboy, curtainside, B-train) and the truck-mounted forklift;
- the distance, the lane and the carrier’s empty return trip;
- the weight and dimensions of the materials, which set the payload required;
- waiting and unloading time on the job site;
- spring and its thaw, plus the permits and escorts of an oversize load.
The cost items are explained in our guide to road freight costs in Canada; cargo insurance protects your materials in transit.
Why trust us with your construction freight
- More than 25 years of freight brokerage. Since 2000, our Laval team has coordinated freight across Quebec and elsewhere in North America.
- Several fleets rather than one. At the height of construction season, when a carrier has no flatbed left, we look for another qualified trailer in the network.
- One contact, every mode. From road transport to materials imported by container through our import from Asia service, one contact follows the supply of your job sites.
- Vetted carriers. Safety, insurance and equipment of each truck checked before loading.
Your crew builds, we take care of what arrives on site.
Construction freight across Quebec
Montreal, the North Shore, the South Shore, the Eastern Townships, Beauce, Saguenay, Ontario or the Maritimes: for each job site, we confirm in the quote the network carrier that serves the lane. A job site in the United States? See cross-border shipping. Contractors in the Quebec City and Laval areas also have their own local freight broker page. Building materials makers will find their page on our manufacturing freight broker service.
FAQ: construction freight broker
What does a freight broker do in construction?
It acts as the go-between for your job site and the carriers: it chooses the trailer, books the carrier, sets the delivery window and tracks the truck until unloading. At Trans-Inter Logistik, we also organize pickup at your suppliers and hand over the signed proof of delivery. Trucks, trailers and drivers belong to the vetted carriers in our network.
Can you deliver to a job site without a forklift?
It is possible with a flatbed equipped with a Moffett-type truck-mounted forklift, carried at the back of the truck, depending on availability in our network. The driver uses it to set the pallets of materials at the agreed spot. Few flatbeds have one, so we check it from the quote, along with the unloading spot and the ground conditions.
Which trailer should you choose for construction materials?
A flatbed suits lumber, steel and roof trusses, loaded from the sides or by crane. A curtainside trailer protects weather-sensitive materials. A lowboy trailer takes machinery and tall loads. A B-train increases payload for large volumes. We recommend the trailer based on the dimensions and weight of your materials, then confirm its availability.
Does the spring thaw limit materials deliveries?
Yes. Every spring, Quebec’s transportation ministry imposes load restrictions on trucks in three zones of the province, on dates that vary with the weather. A load of pavers, concrete or steel may then be split across two trailers. We plan your spring job site deliveries accordingly.
Do you need a permit to ship job site equipment?
Only if the machinery exceeds the permitted dimensions or weights. Quebec’s transportation ministry then issues the carrier a special travel permit, with conditions on signage, route and sometimes escorts. Our oversize load transport page details these rules; we validate the permit class before confirming a lowboy trailer.
Do you deliver materials as partial loads?
Yes. When your materials take up only part of a flatbed, less-than-truckload (LTL) puts your lot on a shared trailer and bills you for the space used. It is handy for a few pallets of hardware or a batch of pipes. For a job site waiting on a delivery at a set time, a full truckload (FTL) remains more predictable.
Who unloads the materials on the job site?
In most cases, your job site crew, with its forklift or crane. The driver positions the trailer and removes the securement. If the site has no equipment, we look in the network for a Moffett-type truck-mounted forklift. We settle this point from the quote, because waiting time at unloading affects the cost.
How much does shipping construction materials cost?
The cost depends on the trailer type, the distance, the weight and dimensions, unloading time on site and the season. A truck-mounted forklift, tarping or an oversize permit are added when needed. The quote details these factors and the options to optimize your job site’s shipping budget.
Your construction freight partner
Send us the materials list, the supplier and the job site address: you receive a matching trailer and carrier proposal.